VT Energy OS / Door 2: Generate & Monetize
✕ Hub
⚡ 36 Days to MNRE Jan 1, 2027 ALMM List-II Domestic Cell Cutoff • Split-Contract Usance LC Ready • 24-Hr Geo-Fenced Crew Escrow
Tab 2A • Ready Land & Substation Monetization (“Airbnb for C&I Supply”)

Match Your 11/33/132 kV Park With Pre-Audited Corporate PPAs & 75:25 Debt

Zero corporate buyer hunting and zero balance-sheet debt strain—convert ready land and bay approvals into ring-fenced SPV equity.

Live Audited C&I Demand Waiting in Zone: 38.5 MW (Maharashtra AA/AAA Group Captive)
Ring-Fenced Project SPV Capital Stack Weighted PPA: ₹4.05 / kWh
Total SPV CapEx ₹108.00 Cr
75% Co-Lending Debt ₹81.00 Cr IREDA / REC / SBI + IFSC
25% Total SPV Equity ₹27.00 Cr Zero Cash Drain on Landowner
Zero-Friction SPV Equity Waterfall (Inside 25% Equity Pool):
1. C&I Captive Offtakers (26.0% SPV Share)Cash injection by AA/AAA corporate power buyers
₹7.02 Cr
2. Co-Developer Land & Bay Sweat Equity (22.0% SPV Share)Credited against ready NA land + evacuation bay sanction
₹5.94 Cr
3. Sponsor HoldCo Module-Swap Equity (52.0% SPV Share)Funded via ALMM List-I & II TOPCon Module-for-Equity swap
₹14.04 Cr
Working-Capital & SEBI RPT Shield

Split-Contract Usance LC Breakdown

Separates Tier-1 module procurement (42,373 serialized 590 Wp panels) from Balance-of-System & BESS EPC—eliminating EPC cash lockups.

Direct Module OEM Usance LC₹51.00 Cr
• 60% Factory EL/Flash DPP Upload₹30.60 Cr
• 25% Geo-Fenced Site Arrival Scan₹12.75 Cr
• 15% CEIG + 15-Min ABT Meter Sync₹7.65 Cr
Turnkey Solar BoS + BESS EPC Scope₹57.00 Cr